Home > News > Comprehensive Guide to Daily Maintenance of Automatic Hot Mounting Machine: Mold Cleaning and Temperature Sensor Calibration

Comprehensive Guide to Daily Maintenance of Automatic Hot Mounting Machine: Mold Cleaning and Temperature Sensor Calibration

Jin Cheng
2026-02-28
Tutorial Guide
This article comprehensively introduces the key points of daily maintenance and performance calibration of the ZXQ - 4 automatic hot mounting machine from Laizhou Jincheng Industrial Equipment Co., Ltd. It focuses on analyzing the cleaning frequency and methods of the mold, the calibration process of the temperature control sensor, and the anti - scaling treatment techniques for the water - cooling system. Combined with practical operation demonstrations and common fault diagnosis guidance, it helps laboratory administrators and technicians achieve stable operation and long - term maintenance of the equipment, ensuring that the hot mounting machine continuously meets international standards such as ASTM E2554 and ISO 3108. The content is modularly structured, accompanied by FAQs and reminders of operation mistakes to enhance users' self - maintenance ability and operation and maintenance efficiency. It also guides users to obtain professional installation and debugging services and original parts support to assist in laboratory quality control and work efficiency improvement.
Mold cleaning process of ZXQ - 4 automatic hot mounting press

Comprehensive Guide to Daily Maintenance of Automatic Hot Mounting Press ZXQ - 4

In the laboratory environment, the stable operation of the automatic hot mounting press ZXQ - 4 produced by Laizhou Jincheng Industrial Equipment Co., Ltd. is crucial for ensuring the accuracy of experimental results. This guide aims to provide laboratory administrators and technicians with detailed information on the daily maintenance and performance calibration of the ZXQ - 4, helping them achieve long - term stable operation of the equipment and meet international standards such as ASTM E2554 and ISO 3108.

1. Importance and Objectives of Daily Maintenance

Regular maintenance of the ZXQ - 4 can significantly extend its service life, reduce the probability of failures, and ensure the accuracy and consistency of experimental results. The main objectives of maintenance include keeping the equipment clean, ensuring the accuracy of temperature control, and preventing system blockages.

2. Mold Cleaning

Mold cleaning is an essential part of the maintenance process. It is recommended to clean the mold after every 10 - 15 uses. The cleaning process should be carried out in a well - ventilated area. First, turn off the power of the equipment and wait for it to cool down. Then, use a soft brush to remove loose debris from the mold surface. Next, soak the mold in a mild cleaning solution for about 15 - 20 minutes, and then gently scrub it with a brush. Finally, rinse the mold with clean water and dry it thoroughly. Mold cleaning process of ZXQ - 4 automatic hot mounting press

3. Temperature Control Sensor Calibration

Accurate temperature control is vital for the performance of the hot mounting press. The temperature control sensor should be calibrated at least once every three months. The calibration process involves comparing the reading of the sensor with a standard temperature source. If there is a deviation, adjust the sensor according to the manufacturer's instructions. This step ensures that the temperature in the hot mounting process is within the required range, meeting the ASTM E2554 and ISO 3108 standards. Temperature control sensor calibration of ZXQ - 4 automatic hot mounting press

4. Water - Cooling System Anti - Scaling Treatment

The water - cooling system plays a key role in maintaining the stable operation of the equipment. To prevent scaling, it is recommended to add a suitable anti - scaling agent to the cooling water every two months. Regularly check the water level and flow rate of the cooling system, and clean the water filter every month. This can effectively prevent blockages and ensure the normal operation of the cooling system.

5. Standardized Testing of Temperature Uniformity and Pressure Stability

Perform temperature uniformity and pressure stability tests on the equipment at least once a month. Use professional testing equipment to measure the temperature distribution and pressure changes inside the hot mounting press. If the test results do not meet the standards, adjust the equipment in time to ensure the accuracy of the experimental results.

6. Fault Diagnosis and Elimination

In practical use, some common faults may occur, such as heating delays and mold clamping jams. For heating delays, check the power supply, heating elements, and temperature control sensors. For mold clamping jams, check the mechanical parts and lubrication conditions. By referring to the equipment manual and using the troubleshooting guide, most faults can be quickly diagnosed and eliminated. Fault diagnosis of ZXQ - 4 automatic hot mounting press

7. FAQ and Common Operation Mistakes

Here are some frequently asked questions and common operation mistakes:

  • Q: How often should I clean the mold? A: It is recommended to clean the mold after every 10 - 15 uses.
  • Q: What should I do if the temperature control is inaccurate? A: Calibrate the temperature control sensor according to the calibration steps.
  • Common Mistake: Do not operate the equipment without reading the manual carefully, which may lead to equipment damage or inaccurate experimental results.

8. Importance of Professional Installation, Debugging, and Original Parts

Professional installation and debugging can ensure the optimal performance of the equipment. Using original parts can guarantee the compatibility and reliability of the equipment. Laizhou Jincheng Industrial Equipment Co., Ltd. provides professional installation and debugging services, as well as high - quality original parts. By choosing these services, you can ensure the long - term stable operation of your ZXQ - 4 hot mounting press.

If you want to ensure the long - term stable operation of your ZXQ - 4 automatic hot mounting press and get professional installation, debugging services, and original parts support, click here to consult us now!

Name *
Email *
WhatsApp *
Message*

Recommended Products

Related Reading

Choosing a Compact Manual Metallographic Cutting Machine for Space-Limited Research Labs (Q-2 Series Guide)

2026-02-20 | https://shmuker.oss-accelerate.aliyuncs.com/tmp/temporary/60ec5bd7f8d5a86c84ef79f2/60ec5bdcf8d5a86c84ef7a9a/20240305160636/lable.png compact manual metallographic cutting machine Q-2 metallographic cutter space-saving lab cutting equipment metallographic specimen cutting precision smart coolant system for metallography

Comprehensive Standards and Application Limits of Rockwell Hardness Testing for Non-Metallic Materials

2026-02-07 | https://shmuker.oss-accelerate.aliyuncs.com/tmp/temporary/60ec5bd7f8d5a86c84ef79f2/60ec5bdcf8d5a86c84ef7a9a/20240305160636/lable.png non-metallic Rockwell hardness testing Rockwell hardness standards non-metal material hardness measurement Rockwell hardness applications Jincheng MHRS-150 hardness tester

Automatic Hot Mounting Machine Maintenance Guide: Mold Cleaning Frequency & Temperature Sensor Calibration Tips

2026-01-13 | https://shmuker.oss-accelerate.aliyuncs.com/tmp/temporary/60ec5bd7f8d5a86c84ef79f2/60ec5bdcf8d5a86c84ef7a9a/20240305160636/lable.png automatic hot mounting machine maintenance mold cleaning frequency temperature sensor calibration water cooling system descaling equipment performance testing

How to Efficiently Use a Metallographic Polishing Machine for Parallel Sample Processing and Energy-Saving Operations

2026-01-31 | https://shmuker.oss-accelerate.aliyuncs.com/tmp/temporary/60ec5bd7f8d5a86c84ef79f2/60ec5bdcf8d5a86c84ef7a9a/20240305160636/lable.png metallographic polishing machine automatic grinding and polishing sample preparation optimization energy-efficient lab equipment metallography workflow

Precision Control Technology in Multi-Scenario Material Testing Machines: Enhancing Quality Management for Export-Oriented Enterprises

2026-02-08 | https://shmuker.oss-accelerate.aliyuncs.com/tmp/temporary/60ec5bd7f8d5a86c84ef79f2/60ec5bdcf8d5a86c84ef7a9a/20240305160636/lable.png material testing machine precision control multi-scenario material testing solutions metallurgy material mechanical property testing university lab material testing equipment UTM20KNM material tester

Hot Products

Popular articles
Metallographic_Polishing_MachineP-2T-4.jpg
营销主题配图_1753166060112.jpg
营销主题配图_1752550850890.jpg
营销主题配图_1753167363560.jpg
营销主题配图_1753164702268.jpg
营销主题配图_1753169145058.jpg
营销主题配图_1753167988141.jpg
营销主题配图_1753168145322.jpg
营销主题配图_1753165750718.jpg
营销主题配图_1753165739607.jpg
Recommended Reading
Contact us
Contact us
https://shmuker.oss-accelerate.aliyuncs.com/tmp/temporary/60ec5bd7f8d5a86c84ef79f2/60ec5bdcf8d5a86c84ef7a9a/thumb-prev.png